The Pelton Round Butte Hydroelectric Project (Oregon) was built between 1957 and 1964. As a result the anadromous steelhead trout was extirpated from the upper Deschutes Basin by 1968. The Deschutes Basin is a model for instream flow restoration projects in the Pacific Northwest that are largely driven by the...
Published October 1935. Facts and recommendations in this publication may no longer be valid. Please look for up-to-date information in the OSU Extension Catalog: http://extension.oregonstate.edu/catalog
The overall goal of this study was to identify multiple scales of habitat use and habitat electivity by redband/steelhead trout and define the limiting factors affecting the distribution patterns of this species during summer flows.
The main objective in chapter 2 was to identify the most important habitat associations that...