Other Scholarly Content

 

Sand mold clamping Public Deposited

Downloadable Content

Download PDF
https://ir.library.oregonstate.edu/concern/defaults/pn89db804

Descriptions

Attribute NameValues
Creator
Abstract
  • EXECUTIVE SUMMARY PROJECT CONTEXT ESCO Incorporated manufactures a variety of steel parts using a sand mold casting process. In this process a clamping device is used to prevent the sand mold from leaking during the pouring process. The current clamp design has several deficiencies including an uneven distribution of the clamping force, mold damage caused by the engagement of the clamping device, and the manual disengagement of the clamp. These factors result in defective parts and time delays in part manufacturing. The MIME capstone design team 46.1 was tasked with creating an improved clamping device that would eliminate these issues and increase profits for ESCO.
License
Resource Type
Date Available
Date Issued
Degree Level
Non-Academic Affiliation
Rights Statement
Publisher
Peer Reviewed
Language
Replaces
Additional Information
  • description.provenance : Made available in DSpace on 2013-06-05T21:18:48Z (GMT). No. of bitstreams: 2license_rdf: 1232 bytes, checksum: bb87e2fb4674c76d0d2e9ed07fbb9c86 (MD5)Sand Mold Clamping - Final Report.pdf: 6307868 bytes, checksum: feb420cc8a5e0a921523287a2512eacd (MD5)
  • description.provenance : Submitted by Benedikt Bochtler (bochtleb) on 2013-06-05T21:18:48ZNo. of bitstreams: 2license_rdf: 1232 bytes, checksum: bb87e2fb4674c76d0d2e9ed07fbb9c86 (MD5)Sand Mold Clamping - Final Report.pdf: 6307868 bytes, checksum: feb420cc8a5e0a921523287a2512eacd (MD5)

Relationships

Parents:

This work has no parents.

In Collection:

Items