The Pelton Round Butte Hydroelectric Project (Oregon) was built between 1957 and 1964. As a result the anadromous steelhead trout was extirpated from the upper Deschutes Basin by 1968. The Deschutes Basin is a model for instream flow restoration projects in the Pacific Northwest that are largely driven by the...