High performance concrete (HPC) provides a long lasting, durable concrete that is typically used in bridge decks due to its low permeability, high abrasion resistance, freeze-thaw resistance and strength. However, this type of concrete is highly susceptible to the deleterious effects of both autogenous and drying shrinkage. Both types of...
The Sellwood Multi-Modal Center (SMMC) will complement the Sellwood Bridge Replacement Project located in Portland, Oregon. Multnomah County, the client, and David Evans & Associates, the consultant, have identified five possible sites for the Sellwood Multi-Modal Center. The following report describes the analysis and selection of site alternatives for the...
Many older reinforced concrete deck girder (RCDG) bridges contain straight bar terminations of flexural reinforcement. Common bridge design practice of the 1950s did not consider the additional demands on the terminated bars from shear and flexure. Moreover, more stringent code specifications and heavier permit trucks contribute to the insufficient ratings...
Large numbers of reinforced concrete deck girder (RCDG) bridges were built during the highway infrastructure boom of the 1950's. The advent of standardized deformed steel reinforcing bars during this time allowed for straight bar terminations in flexural tension regions. Designers of the time terminated reinforcing bars where they were no...