Critical Path Budgeting is introduced as an integrating tool for
project planning, coordination, and control. Through a synthesis of
budgeting and critical path scheduling, it is possible to treat the time
and cost variables of a project explicitly. Thus, one can analyze the
behavior of the firm as an approximation...
A mathematical model of the atmosphere in an airshed is developed, which relates pollutant source distributions and intensities
to the volume of air available for dispersion and to pollutant concentrations
or air quality standards. It can be used as a tool for obtaining
an answer to an air resource management...
Current observations were obtained at three locations forming
a cross section along 70°34'W longitude in Long Island Sound. Fifteen
days of data were selected from each series so that nearly
simultaneous observations were used in the analysis.
Elementary statistics were computed for the data prior to
performing a least squares...