The focus of this research concentrates on enhancement
of the LOGSIM mechanized log harvesting system
simulator. Enhancement of software focuses on overall
improvement of the user environment as well as improvement
of the performance and capabilities of the simulation
package.
An enhanced version of the front-end interface
program is developed...
This study concerns the use of a discrete-event
simulation model for analyzing the production of a
mechanized forest harvest system. The simulation models a
field collection data set of a harvester-forwarder system
which was previously collected by the Forest Engineering
Department of Oregon State University. The computer
software consisted of...
The potential gains that could be realized from
optimizing timber harvesting are significant. To a great
extent it is these initial functions that dictate the
quality of future manufacturing steps. Timber harvesting
systems are defined by the operations they contain and the
equipment that perform them. For any given harvesting...
Multispan skyline logging systems are cable systems designed to yard logs over steep terrain having a constant or convex slope. An intermediate skyline support is used to raise the skyline high enough to achieve ground clearance without overstressing the skyline. Certain improvements in performance can be realized by providing intermediate...
The planning of harvests and management activities for forested lands has traditionally been done with either binary search or linear programming. Since both these techniques have some advantages over the other, they have remained in wide use. Hoganson and Rose (1984) have suggested a technique that theoretically could overcome some...
Procedures are developed for integrating short-term,
area-based plans with long-term, strata-based harvest
schedules. These procedures were tested on a 4000 hectare
tract of forest land in British Columbia. It is shown that
a combination of these two approaches to forest planning
provides a spatially feasible short-term solution that is
also...
Time studies of logging equipment are important to determine
production rates, calculate logging costs and locate operating inefficiencies. However, using present time study techniques, they are also costly and time consuming to complete. This project will develop a new data gathering and storage technique using the HP-75
portable computer to...
An integrated model combining a wildlife population simulation model, and timber harvest and growth models was developed to explore the tradeoffs between the likelihood of persistence of a wildlife species and timber harvest values on a landscape in the Central Oregon Cascades. Simulated annealing, a heuristic optimization technique, was used...