These four items document the 2010-2011 permitting process to stabilize the eastern edge of the Hatfield Marine Science Center property. During late 2006, erosion forced the closure of the HMSC public estuary trail. In March 2007, an erosion control project using a gravel beach or "dynamic revetment" resulted in the...
Full Text:
supports
the research ofOregonState University and the six federal and state agency programs co-
located
These four items document the 2010-2011 permitting process to stabilize the eastern edge of the Hatfield Marine Science Center property. During late 2006, erosion forced the closure of the HMSC public estuary trail. In March 2007, an erosion control project using a gravel beach or "dynamic revetment" resulted in the...
These four items document the 2010-2011 permitting process to stabilize the eastern edge of the Hatfield Marine Science Center property. During late 2006, erosion forced the closure of the HMSC public estuary trail. In March 2007, an erosion control project using a gravel beach or "dynamic revetment" resulted in the...
These four items document the 2010-2011 permitting process to stabilize the eastern edge of the Hatfield Marine Science Center property. During late 2006, erosion forced the closure of the HMSC public estuary trail. In March 2007, an erosion control project using a gravel beach or "dynamic revetment" resulted in the...
Full Text:
StateofOregon
775 Summer St. NE
Salem, OR 97301
Dear Ms. Landrum:
This letter accompanies the
The application was prepared for the Port of Newport by Pacific Habitat Services and John van Staveren. It was submitted to the Army Corps of Engineers - Portland in May 2010.
The INR worked with the Oregon Department of Environmental Quality, the Oregon Department of Fish and Wildlife, and the federal Environmental Protection Agency to propose an integrated study design for collecting data on Native Fish, Indexes of Biotic Integrity and Water Quality, and Riparian Area Condition and Function. Estimated costs...