Other Scholarly Content

 

Replacement of Rock Creek bridge Public Deposited

Downloadable Content

Download PDF
https://ir.library.oregonstate.edu/concern/defaults/jq085q034

Descriptions

Attribute NameValues
Alternative Title
Creator
Abstract
  • The BLM bridge team inspects bridges identified as part of the BLM transportation infrastructure every two years. Bridges identified as needing repair or replacement are placed on deferred maintenance lists and ranked based on condition and need for action. Upon the last inspection of Rock Creek bridge the buttresses were identified as a hazard to load bearing traffic and a weight limit restriction was placed on the bridge to reduce the risk of bridge failure. The purpose of the proposal is to replace the existing BLM bridge with a crossing sufficient to meet the Klamath Falls BLM and reciprocal right-of-way holder’s access needs during all times of the year. This EA will assist in the decision making process by assessing the environmental and human affects resulting from implementing the proposed action. The EA will also assist in determining if an environmental impact statement (EIS) needs to be prepared or if a finding of no significant impact is appropriate.
Resource Type
Date Available
Date Issued
Non-Academic Affiliation
Series
Rights Statement
Publisher
Peer Reviewed
Language
File Format
File Extent
  • 477224 bytes
Replaces

Relationships

Parents:
In Collection:

Items