Jack Creek culvert replacement Public Deposited

http://ir.library.oregonstate.edu/concern/defaults/v405sg59c

Descriptions

Attribute NameValues
Creator
Abstract or Summary
  • Two Rapid-Span bridges were installed on property owned by Donna Woolley. The total project cost was $130,000. The bridges have concrete running surfaces over two large I-beams.
Resource Type
Date Available
Date Issued
Non-Academic Affiliation
Keyword
Rights Statement
Peer Reviewed
File Format
File Extent
  • 5221270 bytes
Replaces
Additional Information
  • description.provenance : Made available in DSpace on 2006-06-01T23:06:56Z (GMT). No. of bitstreams: 1 project_photo_5.bmp: 5221270 bytes, checksum: c132ec02ce6eb82168f5526a89c9b387 (MD5)
  • description.provenance : Submitted by Renee Davis-Born (renee.davis-born@oregonstate.edu) on 2006-05-30T20:51:00Z No. of bitstreams: 1 project_photo_5.bmp: 5221270 bytes, checksum: c132ec02ce6eb82168f5526a89c9b387 (MD5)
  • Photos and Videos -- Photos

Relationships

In Administrative Set:
Last modified: 12/05/2017

Downloadable Content

Download image
Citations:

EndNote | Zotero | Mendeley

Items