Critical path budgeting : a synthesis of budgeting and critical path scheduling Public Deposited

http://ir.library.oregonstate.edu/concern/graduate_thesis_or_dissertations/73666893k

Descriptions

Attribute NameValues
Creator
Abstract or Summary
  • Critical Path Budgeting is introduced as an integrating tool for project planning, coordination, and control. Through a synthesis of budgeting and critical path scheduling, it is possible to treat the time and cost variables of a project explicitly. Thus, one can analyze the behavior of the firm as an approximation to the cybernetic model. Utilization of budgets and critical path networks enables the expression of the firm's goals in a cost and time language. Time and cost variances are developed as the primary means for control, and the communication system of the firm is analyzed for determining the necessary information flow for decision making. Finally, network analysis is used for defining the decision making activities involved in the suggested approach, and a three-dimensional model is developed for describing' the firm's behavior as it relates to project performance.
Resource Type
Date Available
Date Copyright
Date Issued
Degree Level
Degree Name
Degree Field
Degree Grantor
Commencement Year
Advisor
Committee Member
Academic Affiliation
Non-Academic Affiliation
Subject
Rights Statement
Peer Reviewed
Language
Digitization Specifications
  • File scanned at 300 ppi using Capture Perfect 3.0 on a Canon DR-9050C in PDF format. CVista PdfCompressor 5.0 was used for pdf compression and textual OCR.
Replaces
Additional Information
  • description.provenance : Approved for entry into archive by Patricia Black(patricia.black@oregonstate.edu) on 2014-05-19T14:12:09Z (GMT) No. of bitstreams: 1 DervitsiotisKostas1965.pdf: 4690425 bytes, checksum: 202e768c490ff669bc6ebedc5c4ccd6e (MD5)
  • description.provenance : Approved for entry into archive by Katy Davis(kdscannerosu@gmail.com) on 2014-05-19T19:38:58Z (GMT) No. of bitstreams: 1 DervitsiotisKostas1965.pdf: 4694684 bytes, checksum: aedb9e55cce93278906538cb970a729a (MD5)
  • description.provenance : Submitted by Georgeann Booth (gbscannerosu@gmail.com) on 2014-05-16T20:28:23Z No. of bitstreams: 1 DervitsiotisKostas1965.pdf: 4690425 bytes, checksum: 202e768c490ff669bc6ebedc5c4ccd6e (MD5)
  • description.provenance : Approved for entry into archive by Katy Davis(kdscannerosu@gmail.com) on 2014-05-19T21:48:39Z (GMT) No. of bitstreams: 1 DervitsiotisKostas1965.pdf: 4694684 bytes, checksum: aedb9e55cce93278906538cb970a729a (MD5)
  • description.provenance : Rejected by Katy Davis(kdscannerosu@gmail.com), reason: Replace on 2014-05-19T19:18:47Z (GMT)
  • description.provenance : Submitted by Georgeann Booth (gbscannerosu@gmail.com) on 2014-05-19T19:28:24Z No. of bitstreams: 1 DervitsiotisKostas1965.pdf: 4694684 bytes, checksum: aedb9e55cce93278906538cb970a729a (MD5)
  • description.provenance : Made available in DSpace on 2014-05-19T21:48:39Z (GMT). No. of bitstreams: 1 DervitsiotisKostas1965.pdf: 4694684 bytes, checksum: aedb9e55cce93278906538cb970a729a (MD5) Previous issue date: 1965-05-13

Relationships

In Administrative Set:
Last modified: 10/21/2017

Downloadable Content

Download PDF
Citations:

EndNote | Zotero | Mendeley

Items