Bioretention Establishment Hydrologic Characterization with Drift Correction and Calibration of Fine Water Level Measurements Public Deposited

http://ir.library.oregonstate.edu/concern/graduate_thesis_or_dissertations/9z903320s

Descriptions

Attribute NameValues
Creator
Abstract or Summary
  • Bioretention is a common form of green stormwater infrastructure that is used to attenuate peak flows from urban stormwater. Previous research shows that the bioretention peak response is not consistent across time or space and that the variables that affect peak hydrology are numerous. One variable that has not been well studied is bioretention establishment, or the indefinite period of time following installation during which the soils and plants mature until stabilization of hydrologic performance is achieved. Previous research has investigated changes in infiltration rate, but the peak flow response to this change in infiltration has not been quantified. The primary objective of this research was to characterize bioretention establishment peak hydrology. The runoff from a 9,300 m² drainage area was captured by a grey-green stormwater treatment train using an underground storage tank, a pump, and three parallel bioretention cells with underdrains. One of the cells was monitored for peak flows analysis from October 2014 to May 2015. The water level measurements were observed to drift by up to 29mm, introducing uncertainty into the flow rate measurements. A drift correction method was applied about every eight days to fix the drift. A water balance approach was then used to fine tune the outflow measurements for three storm events to minimize the residual of the water balance to less than 1% of the total inflow volume. Hydrologic function metrics of peak ratio and peak delay were then calculated to investigate the peak flow response to bioretention establishment. Mean peak ratios were 0.54, 0.68, and 0.61 and mean peak delays were 45 minutes, 63 minutes, and 59 minutes for the fall, winter and spring, respectively. No significant differences between the peak ratios were found, however, at least one peak delay had a different mean than the other peak delays (1 way ANOVA, p value < 0.01). This indicates that the establishment period does indeed affect the peak flow hydrology. Future studies should attempt to minimize error in flow rate measurement to further characterize the establishment period and understand how it affects peak flows to improve bioretention design.
Resource Type
Date Available
Date Copyright
Date Issued
Degree Level
Degree Name
Degree Field
Degree Grantor
Commencement Year
Advisor
Committee Member
Non-Academic Affiliation
Keyword
Subject
Rights Statement
Peer Reviewed
Language
Replaces
Additional Information
  • description.provenance : Submitted by Grant Livingston (livingsg@onid.oregonstate.edu) on 2015-07-10T17:37:20Z No. of bitstreams: 2 LivingstonGrantE2015.pdf: 1630146 bytes, checksum: 757eeb16b166a85eee220d656d368cee (MD5) license_rdf: 1370 bytes, checksum: cd1af5ab51bcc7a5280cf305303530e9 (MD5)
  • description.provenance : Made available in DSpace on 2015-07-10T18:19:30Z (GMT). No. of bitstreams: 2 LivingstonGrantE2015.pdf: 1630146 bytes, checksum: 757eeb16b166a85eee220d656d368cee (MD5) license_rdf: 1370 bytes, checksum: cd1af5ab51bcc7a5280cf305303530e9 (MD5) Previous issue date: 2015-06-08
  • description.provenance : Approved for entry into archive by Julie Kurtz(julie.kurtz@oregonstate.edu) on 2015-07-10T17:58:06Z (GMT) No. of bitstreams: 2 LivingstonGrantE2015.pdf: 1630146 bytes, checksum: 757eeb16b166a85eee220d656d368cee (MD5) license_rdf: 1370 bytes, checksum: cd1af5ab51bcc7a5280cf305303530e9 (MD5)
  • description.provenance : Submitted by Grant Livingston (livingsg@onid.oregonstate.edu) on 2015-07-05T20:11:31Z No. of bitstreams: 2 license_rdf: 1370 bytes, checksum: cd1af5ab51bcc7a5280cf305303530e9 (MD5) LivingstonGrantE2015.pdf: 1634530 bytes, checksum: fc55101f4a48756d1c6817c6250edfb2 (MD5)
  • description.provenance : Rejected by Julie Kurtz(julie.kurtz@oregonstate.edu), reason: Rejecting to change the commencement date on the bottom of the title page to read - Commencement June 2016. Also to keep your name listed the same, on the top of the Approval page remove your middle initial "E.". Everything else looks good. Once revised, log back into ScholarsArchive and go to the upload page. Replace the attached file with the revised PDF and resubmit. Thanks, Julie on 2015-07-09T20:31:39Z (GMT)
  • description.provenance : Approved for entry into archive by Laura Wilson(laura.wilson@oregonstate.edu) on 2015-07-10T18:19:30Z (GMT) No. of bitstreams: 2 LivingstonGrantE2015.pdf: 1630146 bytes, checksum: 757eeb16b166a85eee220d656d368cee (MD5) license_rdf: 1370 bytes, checksum: cd1af5ab51bcc7a5280cf305303530e9 (MD5)

Relationships

Parents:

This work has no parents.

Last modified

Downloadable Content

Download PDF

Items