Graduate Thesis Or Dissertation
 

Equipment replacement prioritization measures : simulation and testing for a vehicle fleet

公开 Deposited

可下载的内容

下载PDF文件
https://ir.library.oregonstate.edu/concern/graduate_thesis_or_dissertations/z890rw35q

Descriptions

Attribute NameValues
Creator
Abstract
  • Oregon Department of Transportation (ODOT) Fleet Services manages a fleet that in 2008 included approximately 5,000 pieces of active equipment worth $340–$390 million. Every biennium, a fixed budget is available to replace a certain amount of this equipment. This research evaluated various measures for establishing equipment replacement priorities. A model was developed to simulate the operation of a single equipment class over time, including equipment replacement every two years. Five different equipment classes were simulated using ten measures for establishing replacement priorities. Historical data for these five different equipment classes (provided by ODOT) was used to define various simulation parameters. The effectiveness of each prioritization measure was evaluated using the cost per mile to operate the fleet over the simulated time period.
License
Resource Type
Date Available
Date Issued
Degree Level
Degree Name
Degree Field
Degree Grantor
Commencement Year
Advisor
Committee Member
Academic Affiliation
Non-Academic Affiliation
Subject
权利声明
Publisher
Peer Reviewed
Language
Replaces

关联

Parents:

This work has no parents.

属于 Collection:

单件