Habitat Improvement Project, No. 19 Public Deposited

http://ir.library.oregonstate.edu/concern/technical_reports/dn39x257g

Descriptions

Attribute NameValues
Creator
Abstract or Summary
  • "The following projects were completed between July 1, 1965, and June 30, 1966, under the stream clearance segment of the State-wide Stream Improvement Program. The larger segments were initiated by requesting competitive bids with the contract for logjam removal awarded to the lowest acceptable bid. The smaller projects were undertaken either by force account or rental of equipment complete with operator. The equipment and method used on each project varied." (From First Paragraph)
Resource Type
Date Available
Date Issued
Subject
Rights Statement
Publisher
Peer Reviewed
Language
Digitization Specifications
  • File scanned at 300 ppi (256 Grayscale) using Capture Perfect 3.0.82 on a Canon DR-9080C in PDF format. CVista PdfCompressor 4.0 was used for pdf compression and textual OCR.
Replaces
Additional Information
  • description.provenance : Made available in DSpace on 2013-10-29T15:01:20Z (GMT). No. of bitstreams: 1 HabitatImprovementProject n. 19.pdf: 2153778 bytes, checksum: fa754a49f8054b27da5e5a5f90a3b34a (MD5) Previous issue date: 1966
  • description.provenance : Approved for entry into archive by Patricia Black(patricia.black@oregonstate.edu) on 2013-10-29T15:01:20Z (GMT) No. of bitstreams: 1 HabitatImprovementProject n. 19.pdf: 2153778 bytes, checksum: fa754a49f8054b27da5e5a5f90a3b34a (MD5)
  • description.provenance : Submitted by Susan Gilmont (susan.gilmont@orst.edu) on 2013-10-28T23:37:40Z No. of bitstreams: 1 HabitatImprovementProject n. 19.pdf: 2153778 bytes, checksum: fa754a49f8054b27da5e5a5f90a3b34a (MD5)

Relationships

Parents:

This work has no parents.

Last modified

Downloadable Content

Download PDF

Items