Technical Report

 

State-wide stream improvement, stream clearance segment [1965-1966] Público Deposited

Conteúdo disponível para baixar

Baixar PDF
https://ir.library.oregonstate.edu/concern/technical_reports/dn39x257g

Descriptions

Attribute NameValues
Alternative Title
Creator
Abstract
  • The following projects were completed between July 1, 1965, and June 30, 1966, under the stream clearance segment of the State-wide Stream Improvement Program. The larger segments were initiated by requesting competitive bids with the contract for logjam removal awarded to the lowest acceptable bid. The smaller projects were undertaken either by force account or rental of equipment complete with operator. The equipment and method used on each project varied. Where sealed bids were involved, the most feasible piece of equipment was specified and the job bid complete with operator and choker setters. The rental and force account method employed a piece of equipment found locally that could satisfactorily do the job. Oregon Game Commission stream clearance personnel worked directly with the operator on the force account projects. On the contracts, the Game Commission employees laid out the work, scheduled the logjam areas, and, in general, supervised the work and passed on its acceptability.
Resource Type
Date Available
Date Issued
Non-Academic Affiliation
Series
Subject
Declaração de direitos
Publisher
Peer Reviewed
Language
Digitization Specifications
  • File scanned at 300 ppi (256 Grayscale) using Capture Perfect 3.0.82 on a Canon DR-9080C in PDF format. CVista PdfCompressor 4.0 was used for pdf compression and textual OCR.
Replaces

Relações

Parents:

This work has no parents.

Em Collection:

Itens