State-wide stream improvement, stream clearance segment [1964-1965]

Público Deposited

Contenido Descargable

Descargar PDF
https://ir.library.oregonstate.edu/concern/technical_reports/k643b2238

Descriptions

Attribute NameValues
Creator
Abstract
  • The following projects were accomplished between February 1, 1964 and June 30, 1965, under the stream clearance segment of State-wide Stream Improvement. The projects were accomplished by selecting contractors under the procedure of using sealed bids. Smaller projects were completed by Force Account. The heavy equipment used on each project varied as to those specified in each contract. On all major projects the contractor obtaining the bids furnished all personnel for the entire job. Force Account projects were accomplished by hiring the equipment with Game Commission stream clearance personnel working directly with the operator. As a result of the clearance projects, approximately 176 miles of additional spawning streams were made available to anadromous fish.
Resource Type
Fecha Disponible
Fecha de Emisión
Non-Academic Affiliation
Series
Subject
Declaración de derechos
Publisher
Peer Reviewed
Language
Digitization Specifications
  • File scanned at 300 ppi (256 Grayscale) using Capture Perfect 3.0.82 on a Canon DR-9080C in PDF format. CVista PdfCompressor 4.0 was used for pdf compression and textual OCR.
Replaces

Relaciones

Parents:

This work has no parents.

En Collection:

Elementos