Utility Market Initiative Public Deposited

http://ir.library.oregonstate.edu/concern/technical_reports/vq27zp08n

Descriptions

Attribute NameValues
Creator
Abstract or Summary
  • In February 2009, the Oregon Wave Energy Trust kicked off a project titled the Utility Market Initiative (UMI). The project's purpose was to initiate a process to align the needs of the regional electric utilities with the resource potential of the wave energy industry. Pacific Energy Ventures' proposal that include a broad multi-disciplinary team was selected and the effort began in May 2009. The UMI establishes useful tools and effective strategies to address the technical and business issues currently facing both the utility companies and wave energy industry. The project addressed the following tasks: utility engagement, resource potential, business model, grid integration tools. Each task has several components and are covered in separate files as labeled.
Resource Type
Date Available
Date Issued
Citation
  • Pacific Energy Ventures. 2009/2010. Utility Market Initiative. Oregon Wave Energy Trust, Portland, OR. vp.
Non-Academic Affiliation
Keyword
Table of Contents
  • Project Overview; Task 1: Utility Engagement; 1.1 Utility Advisory Group – Overview; 1.2 Draft NWPCC 6th Power Plan Language; Task 2: Resource Potential;2.1.1 EPRI Wave Energy Technology Assessment; 2.1.2 Garrad Hassan Wave Energy Technology Review; 2.1.3 Oregon Wave Project Database 2.2 Wave Resource Assessment; 2.3 Forecast of Potential Wave Energy in Oregon; 2.4 Oregon Coastal Transmission Map and Substations; Task 3: Business Model; 3.1 Utility Industry in Oregon; 3.2.1 Market Review (International); 3.2.2 Price Support Alternatives Analysis; 3.3.1 Value of Wave Power – Summary of Results; 3.3.2 Value of Wave Power – Model Documentation; 3.3.2.1 Wave Energy Valuation Model; 3.4 Business Protocols; 3.5.1 Overview of International Standards; 3.5.2 Marine Hydrokinetics Technical Standards (TC 114); Task 4: Grid Integration Tools; 4.1 Interconnection Guidelines; 4.2 Integrated Systems Analysis; 4.3.1 Forecasting Requirements; 4.3.2 EPRI WaveWatch III Review/Implementation Plan; 4.4 Scheduling Requirements and Challenges; 4.5.1 Technical and Operational Barriers; 4.5.2 Integration and Balancing of Wave Energy; 4.6 Telemetry
Rights Statement
Funding Statement (additional comments about funding)
Publisher
Language
Digitization Specifications
  • PDF
Replaces
Additional Information
  • description.provenance : Submitted by Janet Webster (janet.webster@oregonstate.edu) on 2010-10-30T00:09:15Z No. of bitstreams: 32 Task-3-Business-Model-1.pdf: 174389 bytes, checksum: e08bfbb17a8b1c49bf579ab26e801da6 (MD5) Task-3.2.1-Garrad-Hassan-Market-Review-International-1.pdf: 878819 bytes, checksum: 85a5223c62304db10c6ec93a251e4ec4 (MD5) Task-3.3.2-Value-of-Wave-Power_Model-Documentation-1.pdf: 456344 bytes, checksum: 7be40d9a2e2a638112dc6fb855bbc8a1 (MD5) Task-3.4-Business-Protocols.pdf: 274381 bytes, checksum: ba32a1bbc7e1ecfa96c1c3b4088d963f (MD5) Task-3.5.2-Marine-Hydrokinetics-Technical-Standards-TC-114.pdf: 232502 bytes, checksum: 6d1a2abc5e9cdaf1eac31281114c6e95 (MD5) Task-4.2-Integrated-Systems-Analysis-1.pdf: 1527683 bytes, checksum: 7ba7ab7f3d07052eaa1b617750581eb5 (MD5) Task-4.3.1-Forecasting-Requirements.pdf: 246270 bytes, checksum: e232aa4de499c3dc5e3498c2cd3e7abb (MD5) Task-4.5.2-Integration-and-Balancing-of-Wave-Energy.pdf: 129505 bytes, checksum: 69633a98de69fe342c2c1e7952178af8 (MD5) Task-4.4-Scheduling-Requirements-and-Challenges.pdf: 142429 bytes, checksum: 8475704166d1a2de611dd7a9bd1204cf (MD5) Task-1.1-Utility-Advisory-Group.pdf: 175378 bytes, checksum: e51e094cdef80e3ef9b2425e5c90cc42 (MD5) Task-2.3-Forecast-of-Potential-Wave-Energy-in-Oregon.pdf: 208093 bytes, checksum: b6047379df620fda94e11b7dbd216019 (MD5) Task-2.4-Oregon-Coastal-Transmission-Map-and-Substations.pdf: 1394004 bytes, checksum: 5b8e26d3071089ee231431ab5d9112f5 (MD5) Task-3.2.2-Price-Support-Alternatives-Analysis.pdf: 436359 bytes, checksum: 70a6b6ff7d9442f24c12276802cd5222 (MD5) Task-3.3.1-Value-of-Wave-Power_Summary.pdf: 219971 bytes, checksum: d8aef55b43e57c3194cfe56d0bb71dd3 (MD5) Task-3.3.2-Value-of-Wave-Power_Model-Documentation-1.pdf: 456344 bytes, checksum: 7be40d9a2e2a638112dc6fb855bbc8a1 (MD5) Task-3.5.1-Overview-of-International-Standards.pdf: 140538 bytes, checksum: ce71afd79aadcb2bed4a8468499cd739 (MD5) Task-4-Grid-Integration-Tools1.pdf: 160258 bytes, checksum: b727d70b5bf0f546dc9cca0a14c0a31e (MD5) Task-4.1-Interconnection-Guidelines-1.pdf: 1712478 bytes, checksum: 940137a43b1dfda38d7da05f6697ae4d (MD5) Task-4.3.2-EPRI-WaveWatch-III-Review_Implementation-Plan.pdf: 1454262 bytes, checksum: 5624348ff9b631f3eaf04f28e7d77c84 (MD5) Task-4.5.1-Technical-and-Operational-Barriers.pdf: 182165 bytes, checksum: ed98c858b855877029717bd8d3a52825 (MD5) Task-4.6-Telemetry.pdf: 137533 bytes, checksum: 40086059db3605a8237f6ec6c2d18a1e (MD5) Project-Overview_UMI-1.pdf: 345200 bytes, checksum: 688f5ec55177cab02f462cb43c48f284 (MD5) Task-1-Overview.pdf: 189664 bytes, checksum: e85b3fcdf2edcde02391750df220a5dd (MD5) Task-1.2-NWPCC-Wave-Energy-Language.pdf: 172156 bytes, checksum: 97497480144240c3cd0560ce901931dc (MD5) Task-2-Overview.pdf: 180283 bytes, checksum: ac1d950f95451b12776163461f1c72eb (MD5) Task-2.1.1-EPRI-Wave-Energy-Tech-Assessment-2009.pdf: 1586633 bytes, checksum: 408d0b72b51273f80347f43996f8c3da (MD5) Task-2.1.2-Garrad-Hassan-Wave-Energy-Technology-Review.pdf: 822139 bytes, checksum: 3bbc55c900a1b4b53f709350fc5c3e51 (MD5) Task-2.1.3-Oregon-Wave-Project-Database.pdf: 469976 bytes, checksum: b586ec86d9555ef4806f6b238a9b71cb (MD5) Task-2.2-Wave-Resource-Assessment.pdf: 1395698 bytes, checksum: 9831335261ba40dd0fca83f732b3ae71 (MD5) Task-3.1-Utility-Industry-in-Oregon.pdf: 633712 bytes, checksum: 552d2337132e4da79a3e441222159523 (MD5) license_text: 20924 bytes, checksum: 2007e731b83279338882cd4d9f98fc08 (MD5) license_rdf: 19084 bytes, checksum: 2521a6810e93d3d6d43299f55472eb32 (MD5)
  • description.provenance : Made available in DSpace on 2010-10-30T00:09:15Z (GMT). No. of bitstreams: 32 Task-3-Business-Model-1.pdf: 174389 bytes, checksum: e08bfbb17a8b1c49bf579ab26e801da6 (MD5) Task-3.2.1-Garrad-Hassan-Market-Review-International-1.pdf: 878819 bytes, checksum: 85a5223c62304db10c6ec93a251e4ec4 (MD5) Task-3.3.2-Value-of-Wave-Power_Model-Documentation-1.pdf: 456344 bytes, checksum: 7be40d9a2e2a638112dc6fb855bbc8a1 (MD5) Task-3.4-Business-Protocols.pdf: 274381 bytes, checksum: ba32a1bbc7e1ecfa96c1c3b4088d963f (MD5) Task-3.5.2-Marine-Hydrokinetics-Technical-Standards-TC-114.pdf: 232502 bytes, checksum: 6d1a2abc5e9cdaf1eac31281114c6e95 (MD5) Task-4.2-Integrated-Systems-Analysis-1.pdf: 1527683 bytes, checksum: 7ba7ab7f3d07052eaa1b617750581eb5 (MD5) Task-4.3.1-Forecasting-Requirements.pdf: 246270 bytes, checksum: e232aa4de499c3dc5e3498c2cd3e7abb (MD5) Task-4.5.2-Integration-and-Balancing-of-Wave-Energy.pdf: 129505 bytes, checksum: 69633a98de69fe342c2c1e7952178af8 (MD5) Task-4.4-Scheduling-Requirements-and-Challenges.pdf: 142429 bytes, checksum: 8475704166d1a2de611dd7a9bd1204cf (MD5) Task-1.1-Utility-Advisory-Group.pdf: 175378 bytes, checksum: e51e094cdef80e3ef9b2425e5c90cc42 (MD5) Task-2.3-Forecast-of-Potential-Wave-Energy-in-Oregon.pdf: 208093 bytes, checksum: b6047379df620fda94e11b7dbd216019 (MD5) Task-2.4-Oregon-Coastal-Transmission-Map-and-Substations.pdf: 1394004 bytes, checksum: 5b8e26d3071089ee231431ab5d9112f5 (MD5) Task-3.2.2-Price-Support-Alternatives-Analysis.pdf: 436359 bytes, checksum: 70a6b6ff7d9442f24c12276802cd5222 (MD5) Task-3.3.1-Value-of-Wave-Power_Summary.pdf: 219971 bytes, checksum: d8aef55b43e57c3194cfe56d0bb71dd3 (MD5) Task-3.3.2-Value-of-Wave-Power_Model-Documentation-1.pdf: 456344 bytes, checksum: 7be40d9a2e2a638112dc6fb855bbc8a1 (MD5) Task-3.5.1-Overview-of-International-Standards.pdf: 140538 bytes, checksum: ce71afd79aadcb2bed4a8468499cd739 (MD5) Task-4-Grid-Integration-Tools1.pdf: 160258 bytes, checksum: b727d70b5bf0f546dc9cca0a14c0a31e (MD5) Task-4.1-Interconnection-Guidelines-1.pdf: 1712478 bytes, checksum: 940137a43b1dfda38d7da05f6697ae4d (MD5) Task-4.3.2-EPRI-WaveWatch-III-Review_Implementation-Plan.pdf: 1454262 bytes, checksum: 5624348ff9b631f3eaf04f28e7d77c84 (MD5) Task-4.5.1-Technical-and-Operational-Barriers.pdf: 182165 bytes, checksum: ed98c858b855877029717bd8d3a52825 (MD5) Task-4.6-Telemetry.pdf: 137533 bytes, checksum: 40086059db3605a8237f6ec6c2d18a1e (MD5) Project-Overview_UMI-1.pdf: 345200 bytes, checksum: 688f5ec55177cab02f462cb43c48f284 (MD5) Task-1-Overview.pdf: 189664 bytes, checksum: e85b3fcdf2edcde02391750df220a5dd (MD5) Task-1.2-NWPCC-Wave-Energy-Language.pdf: 172156 bytes, checksum: 97497480144240c3cd0560ce901931dc (MD5) Task-2-Overview.pdf: 180283 bytes, checksum: ac1d950f95451b12776163461f1c72eb (MD5) Task-2.1.1-EPRI-Wave-Energy-Tech-Assessment-2009.pdf: 1586633 bytes, checksum: 408d0b72b51273f80347f43996f8c3da (MD5) Task-2.1.2-Garrad-Hassan-Wave-Energy-Technology-Review.pdf: 822139 bytes, checksum: 3bbc55c900a1b4b53f709350fc5c3e51 (MD5) Task-2.1.3-Oregon-Wave-Project-Database.pdf: 469976 bytes, checksum: b586ec86d9555ef4806f6b238a9b71cb (MD5) Task-2.2-Wave-Resource-Assessment.pdf: 1395698 bytes, checksum: 9831335261ba40dd0fca83f732b3ae71 (MD5) Task-3.1-Utility-Industry-in-Oregon.pdf: 633712 bytes, checksum: 552d2337132e4da79a3e441222159523 (MD5) license_text: 20924 bytes, checksum: 2007e731b83279338882cd4d9f98fc08 (MD5) license_rdf: 19084 bytes, checksum: 2521a6810e93d3d6d43299f55472eb32 (MD5) Previous issue date: 2009-12

Relationships

In Administrative Set:
Last modified: 07/08/2017 Default
Citations:

EndNote | Zotero | Mendeley

Items