dc.description The Sellwood Multi-Modal Center (SMMC) will complement the Sellwood Bridge Replacement Project located in Portland, Oregon. Multnomah County, the client, and David Evans & Associates, the consultant, have identified five possible sites for the Sellwood Multi-Modal Center. The following report describes the analysis and selection of site alternatives for the SMMC by CHANGE Engineering Services. Through this analysis CHANGE Engineering Services concludes that Site 5, DR South, is the most suitable location for the SMMC. Building on Site 5 will ultimately save construction costs, provide better circulation of traffic, decrease the projected design schedule, and best comply with LEED and ASCE sustainability metrics. Furthermore, the location satisfies social considerations such as bicycle and pedestrian access, community values, and anticipated use of the facility. en_US
dc.description.sponsorship Multnomah County, David Evans & Associates en_US
dc.description.tableofcontents Executive Summary (i), Table of Contents (1), Introduction (7), Purpose & Need (10), General Analysis (12), Project Charter (13), Site Summary Report (18), Preliminary Site Layouts (26), Cost Estimate (31), Constraints (34), Permitting Plan (36), Preliminary Transportation Study (37), Sustainability (43), Site Selection Matrix (54), Preliminary Planning & Design Schedule (62), Operational Business Plan (63), Mentor Utilization Report (67), Appendix A: Project Charter (A-1), Appendix B: Site Visit Plan & Evaluation (B-1), Appendix C: Cost Estimate Table (C-1), Appendix D: Permitting Plan (D-1), Appendix E: LEED Score Cards (E-1), Appendix F: ASCE Sustainability Rating (F-1), Appendix G: Preliminary Planning & Design Schedule (G-1) en_US
dc.language.iso en_US en_US
dc.subject Civil Engineering Capstone en_US
dc.subject Writing Intensive Course (WIC) en_US
dc.title Sellwood Multi-Modal Center Alternative Analysis & Selection Report en_US
dc.type Other en_US


The following license files are associated with this item:

This item appears in the following Collection(s)

Show simple item record

Search ScholarsArchive@OSU


Advanced Search

Browse

My Account

Statistics