This pipe was installed in 2005 by Johnson Rock Products. The culvert has aluminized weir plates welded to the inside of the pipe at 10-foot intervals. The tributary on which this culvert was installed flows into Paradise Creek, a tributary to the main Umpqua west of Drain.
Two Rapid-Span bridges were installed on property owned by Donna Woolley. The total project cost was $130,000. The bridges have concrete running surfaces over two large I-beams.
This project included 8 miles of fencing, 18 stock water tanks, 10 acres of riparian planting, 1 hardened crossing and 1 culvert crossing. Six landowners participated in the project.
This log placement project took place on Argue Creek, a tributary to Big Creek in the Smith River Basin. ODFW habitat biologists designed and inspected this project in 2004.
Fish viewing station at Winchester Dam in Winchester on the North Umpqua River. This project was implemented by the Project Leadership class of 2000, and the project cost was $100,000.