Although some of the most difficult problems in forest management occur as a result of timber harvest operations, present methodology in harvest planning emphasizes guidelines which rely heavily upon the experience of the individual forest manager for their correct application. This study was undertaken in an effort to develop a...
A technique for solving efficiently the catenary problem encountered in surveying with tapes is presented. The theory of the catenary solution is outlined, and our technique is shown to solve correctly the catenary for all conditions. Analysis of error that compared the catenary correction to the more commonly used parabolic...
Yarding delays add significantly to the time and cost required to obtain a given quantity
of timber. In this study, they increased total yarding time by as much as 28 percent. As yarding system complexity increases, the frequency of delays can also be expected to increase. For one balloon yarding...
This report supplements Research Bulletin 18 (1975) of the Forest Research Laboratory, School of Forestry, Oregon State University. Bulletin 18 summarized analyses of data for the first field season of the Pansy Basin Study. This Bulletin extends those analyses to the second, and final, field season. Time-study observations during the...
This report describes initial results of a yarding time study for the Pansy Basin Study, a cooperative research project designed to test the performance of skylines, balloons, and helicopters operating under various conditions of timber and terrain, and over a range of silvicultural and landscape design prescriptions. Observations during the...