Published October 1908. Facts and recommendations in this publication may no longer be valid. Please look for up-to-date information in the OSU Extension Catalog: http://extension.oregonstate.edu/catalog
Footings shall be of concrete, six inches square at
top and twelve inches at bottom. To be composed of one
part Portland cement, three parts charp, clean sand and
six parts of good clean gravel.
"Since the present power and heating plant was installed the number of buildings has increased so rapidly
that the present equipment is unable to supply the necessary power for the proposed electrical and mechanical
laboratories.
In this design it is assumed that Waldo and
Cauthorn halls are to be heated...
A mineral map is often of considerable value to
those interested in miring work and development. Since
there are very few, if any such maps for Oregon, we have
endeavored to cover the ground, though only in an incomplete way, since the time we had for working upon it was...
Published June 1900. Facts and recommendations in this publication may no longer be valid. Please look for up-to-date information in the OSU Extension Catalog: http://extension.oregonstate.edu/catalog