Fish viewing station at Winchester Dam in Winchester on the North Umpqua River. This project was implemented by the Project Leadership class of 2000, and the project cost was $100,000.
This log placement project took place on Argue Creek, a tributary to Big Creek in the Smith River Basin. ODFW habitat biologists designed and inspected this project in 2004.
This project included 8 miles of fencing, 18 stock water tanks, 10 acres of riparian planting, 1 hardened crossing and 1 culvert crossing. Six landowners participated in the project.
Two Rapid-Span bridges were installed on property owned by Donna Woolley. The total project cost was $130,000. The bridges have concrete running surfaces over two large I-beams.
This pipe was installed in 2005 by Johnson Rock Products. The culvert has aluminized weir plates welded to the inside of the pipe at 10-foot intervals. The tributary on which this culvert was installed flows into Paradise Creek, a tributary to the main Umpqua west of Drain.