There is a lack of fundamental knowledge about the role which adhesive flow and infiltration plays in the micro-mechanical performance of wood adhesive bonds. This data set, for the first time, provides a way to study directly the relationship between adhesive flow and the micro-mechanics of wood adhesive bonds.
Specimens...
Fish viewing station at Winchester Dam in Winchester on the North Umpqua River. This project was implemented by the Project Leadership class of 2000, and the project cost was $100,000.
This log placement project took place on Argue Creek, a tributary to Big Creek in the Smith River Basin. ODFW habitat biologists designed and inspected this project in 2004.
This project included 8 miles of fencing, 18 stock water tanks, 10 acres of riparian planting, 1 hardened crossing and 1 culvert crossing. Six landowners participated in the project.
Two Rapid-Span bridges were installed on property owned by Donna Woolley. The total project cost was $130,000. The bridges have concrete running surfaces over two large I-beams.