In this research, a bi-criteria group scheduling problem is investigated in hybrid flow shop (HFS) environments, where the parallel machines in each stage are unrelated, meaning not identical. The objective of the problem is to minimize a linear combination of the total weighted completion times as a means of complying...
This study was conducted to determine the level of knowledge required
by graduating manufacturing engineering students in various
manufacturing engineering competency areas as perceived by managers
of manufacturing from 17 major manufacturing industrial classifications
in the state of Oregon.
Methods and Procedures
A preliminary listing of competency areas was developed...
It is crucial for the development of high quality products that design requirements are identified and clarified as early as possible in the design process. In many projects the design requirements and design specifications evolve during the project cycle. Shifting needs of the customer, advancing technology, market considerations and even...