The data used in the design of this hydro-electric
generating station was furnished by Hon. Walter M. Pierce
from a survey conducted by T. R. Barry C. E. in the service
of the Grande Ronde Water Co. during the summer of
1906.
In the preparation of this thesis there were...
A feasible development for a Hydro-Electric power
plant can be found in the Mary's River. About 9 miles
west of Corvallis, the north fork of the stream affords
an excellent situation for a dam site. The canon of
the north fork at this point is very narrow, and having
good...
One of the most important and likewise practical problems that oonfront
the Electrioal Engineers of the present daysis the design and the
construotion of Hydro Electrio Power plants for the generating of electrioal
energy,both for power and li;hting purposes. In order that we
might become better acquainted with the facts...
Published November 1906. Facts and recommendations in this publication may no longer be valid. Please look for up-to-date information in the OSU Extension Catalog: http://extension.oregonstate.edu/catalog
Published June 1903. Facts and recommendations in this publication may no longer be valid. Please look for up-to-date information in the OSU Extension Catalog: http://extension.oregonstate.edu/catalog
Published November 1991. Facts and recommendations in this publication may no longer be valid. Please look for up-to-date information in the OSU Extension Catalog: http://extension.oregonstate.edu/catalog