Miller Lake was chemically treated with toxaphene on September 16, 1958 to destroy a population of parasitic lamprey (E.tridentatus) and Tui Chub (Siphatelep bicolor). Toxaphene was applied at the rate of 0.04 ppm. No lamprey or fish have been collected in the lake since the chemical treatment. Work since 1959...
Malheur Reservoir located in Malheur County, Oregon, was chemically treated with liquid rotenone on October 11, 1962 to eliminate an abundant population of black crappie and a smaller population of fine scale suckers and redside shiners.
Tests for toxicity indicated the reservoir had detoxified prior to December 1, 1962.
A...
Malheur Reservoir in Malheur County, Oregon, was chemically treated on October 11, 1962, to eliminate an abundant population of black crappie and a smaller population of finescale suckers and redsided shiners. A total of 1,100 gallons of liquid synergized rotenone (Pro-Noxfish) was used to establish a toxicity of 1.5 p.p.m....
Rehabilitation of Bully Creek Reservoir, its tributaries, and segments of the Malheur River system was completed in 1963. All waters treated supported large populations of undesirable fish. The treatment procedures are discussed by project segment within the report. A portion of the funds was appropriated by the U. S. Bureau...
Fintrol-5 was experimentally tested in six isolated gold dredge ponds in Sumpter Valley. The tests revealed all coarse fish in treated ponds were killed in a period varying between 7 hours and 144 hours; toxic water subbing from treated ponds would kill fish in downstream ponds if water table dillution...
The project objectives were to determine the possibility of raising the subterranean water in adequate amounts by installation of an underground weir; to determine what type of structure would be most feasible; and to formulate a biological evaluation program if the first two objectives were accomplished. Tex Creek, tributary to...
South Twin Lake in Deschutes County, Oregon was chemically treated September 14, 1965, to eliminate a population of Tui Chub (Siphateles bicolor). A total of 605 gallons of liquid synergized rotenone and 9,750 pounds of powdered rotenone was applied to the lake. It was estimated that 130,000 mature chub were...
Clear Creek, tributary of North Fork John Day River, is a mountain stream located in the Blue Mountains of eastern Oregon. It joins Granite Creek about 1.5 miles below the old abandoned mining town of Granite. Gravel removed from Clear Creek by gold dredging activity was replaced in a 3.37-mile...
A segment of the Crooked River, Crook County, Oregon, was chemically treated along with sections of Ochoco Creek, McKay Creek, and Dry River from August 13 to November 5, 1963.' A total of 860 gallons of liquid synergized rotenone (Pro-Noxfish) was used to obtain toxicities up to 2.0 ppm in...
The following projects were completed between July 1, 1965, and June 30, 1966, under the stream clearance segment of the State-wide Stream Improvement Program. The larger segments were initiated by requesting competitive bids with the contract for logjam removal awarded to the lowest acceptable bid. The smaller projects were undertaken...
Upper Cow Lake located in Malheur County, Oregon has a surface area of 975 acres and a volume of 7,150 acre-feet of water. Chemical treatment of the lake was completed September 11, 1963 to remove an abundant population of coarsescale suckers, bridgelip suckers, squawfish, black bullhead, shiners and dace.
Approximately...
Unity Reservoir in Baker County, Oregon, was chemically treated with liquid rotenone on October 17, 1962. Approximately 136 miles of streams and diversion ditches and seven small ponds, tributary to the reservoir, were treated with liquid rotenone prior to work on the reservoir. The reservoir at time of treatment contained...
Upper Cow Lake located in Malheur County, Oregon, Township 28 South, Range 44 East, Section 29, was chemically treated with 2,325 gallons of liquid synergized rotenone (Pro-noxfish) on September 11, 1963 to remove an abundant population of rough fish. The lake has a maximum surface area of 975 acres and...
Fall Creek Reservoir is a unit of the comprehensive plan of the U. S. Army Corps of Engineers for flood control and multiple use of the water resources of the upper Willamette Basin. The reservoir is located on Big Fall Creek, nineteen miles southeast of Eugene in Lane County...Undesirable fish...
The Tenmile Lakes Project for partial control of warm-water fish was initiated in August of 1964, One qualified fishery biologist and one conservation aide were assigned to do the work. The reduction in assigned personnel was due to lack of funds. Although this was to be a joint project with...
Opossum shrimp, Mysis relicta Loven, were collected at Upper Waterton Lake, Alberta, Canada in the summer of 1967, terminating a three-year project. Approximately 1,090,000 Mysis were transplanted into Big Cultus, Crescent, Detroit, Fourmile, Ice, Miller, Odell, Olive, Timothy, Waldo, and Wallowa Lakes in an attempt to enhance the quantity of...
In earlier years, the lower Owyhee River provided excellent trout angling. In recent years, the fishery had declined to one maintained with the annual stocking of legal size hatchery trout on a put and take basis. Stream surveys completed in 1966 indicated the 16 1/2-mile section of the lower river...
The objective of the reservoir research project is to gather and assemble data concerning the game and rough fish populations in Round Butte, Prineville, and Ochoco Reservoirs to enable efficient management of the fisheries.
The project has been divided into three different jobs, and these are:
a. Job 1 -...
The upper drainage of the John Day River system produces summer steelhead and spring chinook salmon. The fish are generally confined to the main stem and its tributaries above Prairie City. The spawning and rearing areas are comparatively free of undesirable fish species, but salmonid smolts migrating downstream must travel...
The construction of Illinois Falls fish ladder on the Illinois River in Oregon was completed in November 1961. The ladder was opened and operated during the winter of 1961-62. Final cleanup and rock removal was completed in the fall of 1962. The ladder was installed on a natural barrier where...