Poor material utilization is inherent to conventional manufacturing processes, leading to high material waste and machining times. Additive manufacturing processes attempt to solve this issue by allowing production of near-net shapes, but the processes may be too expensive or infeasible. By leveraging both processes in a single part, the waste...
In this dissertation, a two stage flexible flow shop scheduling problem is studied, where in stage 1, there are identical batch processors (burnout ovens) and in stage 2, there are identical discrete processors (furnaces). Batch processors perform a pre-heating process on a batch of jobs at a time and discrete...
This research considers a combinatorial optimization scheduling problem in the assembly of printed circuit boards (PCBs) in electronic manufacturing. For the first time in this research, the preparation process, which is typically called kitting operation, is paid attention to and is performed along with the assembly operation, described in this...
In this research, a bi-criteria group scheduling problem is investigated in hybrid flow shop (HFS) environments, where the parallel machines in each stage are unrelated, meaning not identical. The objective of the problem is to minimize a linear combination of the total weighted completion times as a means of complying...
Cellular manufacturing, which is also referred to as group technology among researchers, has primarily been used as a means to increase productivity, efficiency and flexibility. Under group technology, similar jobs, which have similar shape, material, and processing operations are assigned to the same group. Moreover, dissimilar machines are assigned to...
A flexible flowshop, comprised of one or more stages having unrelated parallel machines, is investigated in this research. Unrelated parallel machines can perform the same function but have different capacity or capability. Since this problem is motivated by industry research, dynamic job release times and dynamic machine availability times have...
In container terminals, the efficiency of loading operations in a container yard highly
depends on the productivity of yard cranes. In loading operation, yard cranes have to
pick-up the containers which are stacked in the yard-bays to satisfy the work schedule
requirement of quay crane, the equipment for loading and...
In this research, an analytical model for analyzing a production line consisting of a series
of automated workstations with infinite buffers is developed. Automated workstations are
assumed to have deterministic processing times, and independent exponentially
distributed operating time between failures and repair times. The analytical model starts
with existing results...
The research presented in this dissertation addresses the Multi-Mode Resource-Constrained Project Scheduling Problem (MMRCPSP) in the presence of resource unavailability. This research is motivated by the scheduling of engineering design tasks in automotive product development to minimize the project completion time, but addresses a general scheduling situation that is applicable...
Unrelated parallel machines are machines that perform the same function but have
different capacity or capability. Thus, the processing time of each job would be different
on machines of different types. The scheduling environment considered is dynamic in
both job release time and machine availability. Additionally, each job considered can...