Discusses appropriations for engineering projects in Yaquina Bay, the Willamette River and the Yamhill River. Money was appropriated for continuing improvement of the Yaquina Bay jetties, for a "snag boat" and to build dikes on the Willamette River, and for a lock and dam on the Yamhill River.
Authorizes extensions of the north and south jetties and maintenance dredging to improve the entrance to the harbor at Yaquina Bay. Describes past harbor improvements and expenditures and gives a brief description of the area and economic activities involving the harbor.
In 1892, the bar at the entrance of Yaquina Bay was 14 feet deep at low tide. Requests to deepen the entrance to 25 feet came from local residents, including supporters of T. Egenton Hogg's Oregon Pacific Railroad, which had its terminus on the bay at Yaquina. The request to...
This is a response for a request for improvement of the Yaquina Bay bar and harbor entrance. Includes information on port and terminal facilities, area industries and commerce, and work done upriver from Yaquina to Elk City. Concludes that further work on the harbor entrance is unjustified.
Reports on a study to consider increasing the depth of the channel at the entrance to Yaquina Bay. Recommends against further channel deepening. "In my opinion it is beyond the power of man to make it into a harbor of sufficient capacity for deep-draft ships engaged in foreign commerce, or...
In 1892, the Senate Committee on Commerce requested the original 1880 survey reports on Yaquina Bay be furnished to them. The 1880 documents are included in this report.
Report to accompany House Resolution 8938. Improvements to the entrance to Yaquina Bay had produced a depth of 14 feet at low water at the bar. Greater depth was desired. This bill authorizes a survey to study the problem and estimate costs of deepening the entrance to the harbor.
Reports on work on jetties at the entrance to Yaquina Bay. The south jetty was considered complete about November 1, 1889, but settling and scour caused a need for more reinforcement. The north jetty was about 1/3 complete. Estimates costs. The goal at the time was for the channel to...
The United States' declaration of war on Germany on April 6, 1917 imparted some urgency to harbor improvements. This document describes proposed projects at Yaquina Bay: to extend the south jetty, repair and extend the north jetty, construct a spur jetty and dredge the channel. The justification for these improvements...