Funding agencies increasingly require a data management plan (DMP) with funding proposals, which describe how data generated in the proposed work will be managed, preserved and shared. Data management plans are a rich source of information about an institution’s researchers and their research data management (RDM) knowledge, capabilities, and needs....
Harvesting productivity rates and costs were determined for three
silvicultural treatments used in commercial ground-based thinning of
young stands to achieve timber management objectives and enhance
wildlife habitat. Treatment definitions were based on residual trees
per acre (tpa) after thinning. The treatments were light thin (115
residual tpa), light thin...
In this paper, we introduce a new approach to computing a Morse decomposition of a vector field on a triangulated manifold surface. The basic idea is to convert the input vector field to a piecewise constant (PC) vector field, whose trajectories can be computed using simple geometric rules. To overcome...
Design of time-varying vector fields, i.e., vector fields that can change over time, has a wide variety of important applications
in computer graphics. Existing vector field design techniques do not address time-varying vector fields. In this paper, we present a
framework for the design of time-varying vector fields, both for...
To avoid unresponsiveness, a core part of mobile development is asynchronous programming. Android provides several async constructs that developers can use. However, developers can still use the inappropriate async constructs, which result in memory leaks, lost results, and wasted energy. Fortunately, refactoring tools can eliminate these problems by transforming async...
We investigated the rest frame spectral lags of two complete samples of bright long (50) and short (6) gamma-ray bursts (GRB) detected by Swift. We analysed the Swift/BAT data through a discrete cross-correlation function (CCF) fitted with an asymmetric Gaussian function to estimate the lag and the associated uncertainty. We...
Contract harvest operations have become the preferred approach to reducing the largest cost component of timber production through free market competition amongst logging contractors bidding or negotiating for work. The goal of this research was to investigate economic components of harvesting operations not previously studied for steep slope thinning harvests...
Several efforts have recently been made to relate the displacement of swimming three-link systems over strokes to geometric quantities of the strokes. In doing so, they provide powerful, intuitive representations of the bounds on a system’s locomotion capabilities and the forms of its optimal strokes or gaits. While this approach...