The purpose of this study is to provide background information and examples of best practices relating to platform-train-interface (PTI) safety. The research and information obtained for this manuscript has been in association with the A-40 project funded by the Transit Cooperative Research Program (TCRP) of the National Academies. The purpose...
...................................................................................................................................... 29
RailroadTrack, Station, and Car Maintenance
This study defines the information gathering and communication and response
needed for safety at highway-rail crossings. It examines technologies for low-cost,
high-safety treatments for low volume highway crossings of higher speed (130-200 kph) rail. Crossing closure and consolidation is a necessary first step. Existing
train control and crossing safety systems...