Technical Report
 

Yaquina Bay South Beach Marina sediment evaluation : June, 1991

Public Deposited

Downloadable Content

Download PDF
https://ir.library.oregonstate.edu/concern/technical_reports/9w032817p

Descriptions

Attribute NameValues
Creator
Abstract
  • This evaluation covers the approximately 30,000 cubic yards of material to be excavated from the South Beach Marina Federal project channel. . . The authorized South Beach Marina Federal project channel is 10 feet deep, 100 feet wide and 2,035 feet long. . . The channel has not been dredged since its construction in 1978, and will be dredged to a depth of -11 feet MLLW to ensure that the authorized depth is maintained for as long as possible between dredging events.
Resource Type
Date Available
Date Issued
Keyword
Rights Statement
Publisher
Peer Reviewed
Language
Digitization Specifications
  • File scanned at 300 ppi (Monochrome) using Capture Perfect 3.0.82 on a Canon DR-9080C in PDF format. CVista PdfCompressor 4.0 was used for pdf compression and textual OCR.
Replaces

Relationships

Parents:

This work has no parents.

In Collection:

Items