The concept of a Critical Path Scheduling Tableau is introduced
as an integrating tool for solving industrial engineering problems
involving the application of transitive graphs.
The Tableau is a combination of a precedence matrix and a
boundary time table which may be used to construct graphical representations
for critical path...
Critical Path Budgeting is introduced as an integrating tool for
project planning, coordination, and control. Through a synthesis of
budgeting and critical path scheduling, it is possible to treat the time
and cost variables of a project explicitly. Thus, one can analyze the
behavior of the firm as an approximation...
A single item is to be produced over a given number of time
periods to satisfy the future requirements which are subject to fluctuations.
The production rate and work force level for each time
period are to be decided in order to minimize the production cost
where the costs for...
The purpose of this study is twofold; first, to describe and
analyze the most significant problems encountered by managers of
manufacturing plants in developing countries. American managerial
techniques are taken as basis of comparison. Second, to suggest
approaches and points of view which can be useful to managers and
students...
Successful small business management frequently depends on the manager’s knowledge in five key areas: profit planning, using financial statements, analyzing cash flow, maintaining a healthy financial structure, and the ability to control and plan for future capital needs.