This dissertation demonstrates how Social Cognitive Theory (Bandura, 1986,
1997) can be successfully applied to Counselor academic advising interventions, in
order to increase students' self-efficacy and self-regulated learning (Zimmerman,
2000) in academic planning as learned outcomes. This was accomplished by (a)
reviewing the academic advising literature and showing the current...
This study examines in detail a continuous drop-size distribution
recorder and selected data gathered with this recorder at
various locations on 6, 15, and 31 May 1966. The drop-size distribution
recorder consists of a self-contained, mobile unit able to
operate without electric power. This recorder utilizes "Ozalid 105
SZ" filter...
In 1954, International Engineering Company, Inc.
was employed by the Royal Government of Afghanistan to
complete the design and supervise construction of the
Girishk Power Development Project. The major project
features include: two hydraulic turbine driven generating
units and appurtenant facilities, completion of the six
meter drop structure, and provision...
Full Text:
tnc
OREGON STATE UNIVERSITY
GlfHSHK POWER DEVELOPMENT
PROJECT
LOCATIONAND VICINITY MAPS
RICHARDJ
In 1954, International Engineering Company, Inc.
was employed by the Royal Government of Afghanistan to
complete the design and supervise construction of the
Girishk Power Development Project. The major project
features include: two hydraulic turbine driven generating
units and appurtenant facilities, completion of the six
meter drop structure, and provision...
Full Text:
ABSTRACT OF THE THESIS OF
RICHARD JOSEPH FISHER For The PROFESSIONAL DEGREE In
CIVIL ENGINEERING
Date
In 1954, International Engineering Company, Inc.
was employed by the Royal Government of Afghanistan to
complete the design and supervise construction of the
Girishk Power Development Project. The major project
features include: two hydraulic turbine driven generating
units and appurtenant facilities, completion of the six
meter drop structure, and provision...
Full Text:
VELOPMENT
PROJECT
SINGLE LINE DIAGRA M
RICHARDJ. FISHER
CML ENGINEER DEGREE
APPLICATION APRIL 1962
In 1954, International Engineering Company, Inc.
was employed by the Royal Government of Afghanistan to
complete the design and supervise construction of the
Girishk Power Development Project. The major project
features include: two hydraulic turbine driven generating
units and appurtenant facilities, completion of the six
meter drop structure, and provision...
In 1954, International Engineering Company, Inc.
was employed by the Royal Government of Afghanistan to
complete the design and supervise construction of the
Girishk Power Development Project. The major project
features include: two hydraulic turbine driven generating
units and appurtenant facilities, completion of the six
meter drop structure, and provision...
Full Text:
DEVELOPMENT
PROJECT
PLANS AND SECTIONS
SI) 00f I of 2
RICHARDJ. FISHER
CIVIL ENGINEER DEGREE
APPLICATION
In 1954, International Engineering Company, Inc.
was employed by the Royal Government of Afghanistan to
complete the design and supervise construction of the
Girishk Power Development Project. The major project
features include: two hydraulic turbine driven generating
units and appurtenant facilities, completion of the six
meter drop structure, and provision...
Full Text:
SHOWN
OREGON STATE UNIVERSITY
GIRISHK POWER DEVELOPMENT
PROJECT
SITE PLAN
RICHARDJ. FISHER
CIVIL
Townsend's mole, Scapanus townsendii (Bachman), was
studied by live trapping, dead trapping, and observation
from July 1961, to July 1963, in Tillamook County,
Oregon. This study was initiated at the request of Tillamook County farmers to determine biological facts that
would assist them in their efforts to control this small...
In 1954, International Engineering Company, Inc. was employed by the Royal Government of Afghanistan to complete the design and supervise construction of the Girishk Power Development Project. The major project features include: two hydraulic turbine driven generating units and appurtenant facilities, completion of the six meter drop structure, and provision...
Two strategic approaches to water quality control in Oregon's
Willamette River are presently being utilized: point source treatment
and flow augmentation. Dry weather releases from reservoirs are for
authorized purposes other than water quality. Reservoirs can participate
in pollution control by summer flow augmentation where authorized water
resource objectives (flood...
This study attempted to determine the predictability of adult students' educational orientations and college environmental relationship perceptions according to their enrollment in three contrasting liberal arts baccalaureate degree programs. Additionally, it sought to determine if there was a positive relationship between selected educational orientations and college environmental perceptions of adult...
Chloride containing fertilizers are used to reduce the severity of take-all root rot of wheat in western Oregon and appear to reduce nitrification in moderately acid soils. Objectives of this study were to determine if nitrification is inhibited by the Cl ion, increasing soil solution ionic strength, or changes in...
The differences in the per student cost of education
and the taxes to pay for that education can be attributed,
in part, to the rate of population growth within a school
district. The lowest coats and taxes are found in those
school districts with the fastest growing populations. As
the...
A weather station was established on the dock of the Oregon State
University Marine Science Center, Yaquina Bay, Oregon. A total of
197 weather observations was made from 30 June 1966 to 23 September
1966, with emphasis on the determination of the rate of evaporation
from an evaporation pan and...
The integration of digital and analog systems on single CMOS integrated circuits will continue to be a major area of research as the consumer market demands low power mobile devices in mass quantity. In prototypical analog integrated systems, calibration is often necessary to achieve the desired performance.
In this thesis,...
This report discusses anticipated problems associated with the pollution of the Umpqua River estuary in Oregon. The method of studying these problems by oceanographical techniques is outlined. Proposed studies relating to the Umpqua River Basin are examined.
Oceanographic data collected in the Umpqua River Estuary, Oregon, during the period April 26-27, 1961, are tabulated. Temperature, salinity, velocity, and dissolved oxygen were observed at various depths over one tidal cycle at a mid-channel anchor station located near the mouth of the river.